Arlington, VA
Explore a solar plan shaped around your Arlington property, household energy use, utility requirements, and optional battery-storage goals.
Review the home, roof, energy use, and project goals.
Confirm the applicable utility territory, local authority, and required project steps.
Compare solar-only and solar-plus-storage concepts when the property and goals support them.
Review assumptions, responsibilities, options, and milestones in writing.
Property-specific planning
Arlington's property context changes sharply between transit-oriented corridors and lower-density residential neighborhoods. A detached home, townhouse, condominium, or multifamily building can therefore face a different roof-control and permit path; Arlington's current solar guide specifically requires building and electrical permits for single-family homes and townhouses and directs other building types to the applicable commercial process.
Check the parcel, building and ownership type, roof control, structure, shade, electrical conditions, and corridor context.
Use Arlington County records and account for building type, ownership, and the parcel's planning context.
Confirm the current provider and keep County inspection separate from utility interconnection authorization.
Record the building type, roof-control findings, County permit steps, and separate utility milestones.
System options
Start with the outcome you want, then evaluate the equipment and project structure that fit the property.

Review a rooftop solar concept around the property, household energy use, and current project requirements.

Evaluate optional storage around household priorities, compatible equipment, and the proposed solar design.
Address-specific review
Arlington directs substantial growth to the Rosslyn-Ballston, Richmond Highway, and Columbia Pike corridors while many surrounding neighborhoods retain lower-density residential patterns.
Arlington is a county, not an incorporated city, and it performs both county- and city-type local functions. Confirm that the parcel is within Arlington County before applying its permit guidance.
County approval and utility interconnection are separate. Confirm Dominion Energy Virginia on the current electric account before using its application and authorization process.
State and utility programs can change. Review the current Virginia program sources before a program is included in a proposal.
Review current Virginia programsA clear path
Each stage narrows the plan using property-specific information and current requirements.
Start with the property, contact details, and household energy goals.
Consider roof, shade, energy use, access, and the loads that matter most.
Compare a solar-only or solar-and-storage concept with documented assumptions.
Review responsibilities, requirements, options, and current project milestones in writing.
Arlington FAQ
Address-specific answers for the first stage of a residential project review.
Start with the exact address. Arlington is an urban county, and a property review still needs to confirm the parcel, building and ownership type, electric provider, and current availability before a project path is outlined.
Building type, roof control and ownership, structure, shade, energy use, electrical conditions, and the parcel's corridor or neighborhood context all shape the plan. County and provider requirements are then applied to the verified address.
Arlington County records confirm the local review path, while the current electric account confirms the serving provider. County permits and inspection remain separate from the provider's interconnection authorization.
Optional storage can be reviewed with solar after checking the building type, roof and electrical conditions, equipment compatibility, household priorities, and current County and provider requirements.
Use the official program sources collected on the Virginia planning page. State and utility terms can change, so current eligibility and requirements should be verified before any program is included in a proposal.
Building and ownership review, system design, County building and electrical permits, utility review, equipment, and scheduling can all affect the sequence. Current milestones should be documented for the property.
Start with an address-specific conversation about your property, energy use, and goals.